Six courses, one finished wall.
A masonry project goes from the first call to the first evening you enjoy it in six courses. Here is exactly what happens, in order, and what you can prepare before and after.

Follow the project.
Course 1 of 6
- 01
Call, text or send the form
Tell us what is going on and what you are hoping for. A real person responds, usually the same day, and photos help us prepare.

A real person responds - 02
We visit and measure
We walk the property, look at the masonry, measure the work and talk through drainage, access and what you want it to look like.

Measured on site - 03
Choose the materials and the plan
You see brick, stone and mortar samples and a written estimate with the scope, the options and the price before any work begins.

Samples in your light - 04
Build it course by course
Footings, base and layout come first. Then the masonry goes up in careful courses, with flashing, ties, drainage and clean tooled joints.

Careful, tidy work - 05
Inspect and clean up
We check lines, joints, flashing and drainage, clean the masonry, haul away debris and walk the finished work with you.

Checked before we leave - 06
Enjoy it, and stay in touch
We explain how to care for the work, answer questions after the job and stay available for the seasonal checks a good wall deserves.

Built to be enjoyed
Your site checklist.
- Take photos of the wall, chimney or area from a few steps back and up close
- Note what you see: cracks, soft mortar, stains, damp spots, loose pieces or standing water
- Find the property lines, sprinklers, utilities and any HOA rules
- Think about how you use the space and what you want it to look like
- Clear a path to the work area and move cars and furniture away
Six promises we keep.
Laid by hand, to the line
String lines and levels on every course, every corner.
Options and price in writing
Good, better and best, with what each one includes.
Built to shed water
Flashing, weeps, drainage and tooled joints on every job.
Matched with care
Test samples of brick and mortar, checked in daylight.
Tidy, careful work
Landscaping protected, debris hauled away, the site left clean.
Across Middle Tennessee
28 cities, with the same standard in each.
Process questions
Are your estimates free?
Yes. Estimates are free and come in writing with the scope, the materials, the options and the price. Fill in the form on any page, or call or text 615-431-3789, and we will set up a visit or review your photos.
How long does a typical project take?
A mailbox or a small repair can be done in a day or two. A patio, a chimney rebuild or a retaining wall often takes several days to a couple of weeks, and a large addition or outdoor kitchen can take longer. You get the schedule before work starts.
How should I prepare for the visit or the work?
Clear a path to the work area, move vehicles and furniture away from the walls and tell us about utilities, sprinklers or underground lines. For larger projects we walk you through the schedule and protect the landscaping.
How do I get started?
Fill in the form on any page, call or text 615-431-3789, or send photos of the area. We confirm the plan and schedule a visit, and estimates are free.
Start with the easy part.
Call, text or fill in the form. We look, measure and price before any paid work begins.
